State of Michigan – Grand Rapids Garage Overhead Door Modifications

This project includes structural modifications to allow for the replacement of the existing garage doors with newer, taller doors.

GSA Detroit McNamera Federal Building

GSA Detroit McNamera Federal Building sprinkler system and fire alarm upgrades project. Modifications to upgrade the existing fire sprinkler and fire alarm systems in the building. $298,000.00

State of Michigan – State Police Training Facility Cold Storage Building

State of Michigan – State Police Training Facility Cold Storage Building. Design and build a 7,000 sq. ft. cold storage building including Architectural, engineering, general and skilled trades complete. $324,000.00

Burton Post Office Garage Door Repair

Remove and replace damaged door when a semi struck the door.

Holly Convalescent Center

Holly Michigan – Construction of new 37,000 square foot Institutional Convalescent home including Electrical Service, lighting & power, Fire Alarm System, Nurse Call System, Card Access, Emergency Generator, Telephone & Data, and Site Lighting – $1,365,000.00.

Ann Arbor Housing Commission

  • Miller Manor Service upgrade – Replacement of primary service switch, addition of 480 volt transformer with feeds to mechanical equipment, and replacement of 120/208 existing transformer that serves existing building – $472,000.00
  • North Maple – 9 building, 46 unit housing development. Complete electrical, including site lighting, and low voltage systems.
  • Replacement of low voltage systems in Green Baxter, Maple Meadows and Hikone
  • Green Baxter and Hikone – Electrical rehabilitation including site lighting, tenant units, energy star fixtures
  • Maple Meadows – Electrical rehabilitation including site lighting, tenant units, energy star fixtures in 5 buildings

Gardenview Estates – Phase 5

New construction of single and multi family homes. Project includes all electrical, as well as site power, site lighting, data and communications, and cable TV. $925,000.00

St. Mary’s Mission Point of Detroit St. Mary’s Mission Point of Detroit

Electrical Demolition and rehabilitation of the old Catholic Archdiocese in Detroit, Michigan to a convalescent care home. Work includes power, lighting, fire alarm, door access, cable TV, and Telephone/Data. $1,075,000.00

TACOM

Addition of sub-panel and 250 volt outlets to serve data loads in the existing data room – $2,950.00

Flint Federal Building GSA

  • Addition of 250 volt outlet and data for printers – $1,650.00
  • Painting of Exterior Overhead doors at the Flint Federal Building – $2,600.00
  • Addition of Data outlets and Power for Monitors and TV Screens – $1,401.00

Blue Water Bridge Inspection Facility GSA

  • Addition of Data and Power outlets in the Atrium of the Blue Water Bridge Inspection Facility – $2,225.00
  • Addition of Phone/Data Lines in the High/Low Inspection Booths at the Blue Water Bridge Inspection Facility – $3,440.00
  • Installation of drinking fountain – $2,800.00

Ruth Mott Foundation

Various ongoing and past projects at the Applewood Estates property. Lighting, underground installations, and alterations to the historical buildings throughout the property.

Detroit Custom and Border Patrol Facility

Installation of electrical outlets, and data outlets – $5,405.00

Detroit Levin Courthouse

 Installation of rooftop camera conduit – $3,860.00

Selfridge Air National Guard Base

  • Building 164 Joint Dining Facility Exterior Door Replacement – $39,711.00
  • Building 170 PMEL Automatic Air Lock Door System Installation – $24,451.00
  • Hangar Building 1427 High Bay Lighting Replacement Project – $25,000
  • Hangar Building 35 Clean Air Breathing Compressor – $67,875.00

Install Standby Generator at Vehicle and Travel Services Building

  • Generator replacement project – replacement of (6) 50kw, and (2) 80kw generators at various MPSCS Tower Sites throughout the State of Michigan – $289,000.00
  • Install 250 KW generator and 8,000 gallon tank complete with controls. Replace existing Building switchgear, and provide new ATS switches. Provide CMU wall around generator and tank. – $471,900.00

Cotton Correctional Facility Boiler Replacement Project

Removal and replacement of 5 boilers at the Cotton Correctional Facility. Work includes new pumps, VFD’s, piping and controls. $521,000.00

FAA

Ann Arbor Airport Loop Sensor replacement project consisting of replacing existing loop sensors and restoring complete system to operation. – $3,615.00

Various Fire Alarm Projects

  • Wasserman Building Detroit – Fire Alarm Additions and Upgrades
  • The Royce Detroit – Fire Alarm Upgrades
  • The Grand Traverse Pie Company – New Fire Alarm System Installation
  • American Expedition Detroit – Fire Alarm Upgrades
  • Michigan By The Bottle Royal Oak – New Fire Alarm System Installation
  • Anytime Fitness Lake Orion – New Fire Alarm Installation
  • Sola Salon West Bloomfield – New Fire Alarm Installation
  • Extended Stay Dearborn – New Fire Alarm Installation
  • Salvation Army Detroit – New Fire Alarm Installation
  • Vestevich Office Building – New Fire Alarm Installation
  • Central Towers Apartments, Detroit – Fire Alarm Improvements

Little Dragons Daycare

Vetcon performed the electrical scope for the new Little Dragons Daycare for Swartz Creek Community Schools. Project scope included all lighting and power, as well as a service upgrade, and new fire alarm system.

Kinross Correctional Facility

Vetcon is performing the HVAC renovation project at Kinross Correctional facility located in Kincheloe, MI.

The project scope is to replace 4 boilers and 28 unit ventilators, complete with electrical and controls. Project Value $701,514.00